22/07/09
Substructure Works have commenced for the property at Fulwood House.
02/06/09
MDA have been commissioned to produced detailed design proposals for the substantial refurbishment of an existing 4 bedroom hoilday villa in Spain.

Built in the mid 1970's the existing property requires a complete overhaul and it is proposed that the lower level area is extended to provide additional, seperate accomodation.
20/05/09
MDA have been commissioned to develop proposals for the extension of a late 1970's eco home set in rural location adjacent to a private lake. Partially below ground the existing building is designed to maximises solar gain and ventillate naturally.

MDA are working closely with the client to develop their brief and prepare proposals for a planning application.
04/05/09
MDA have been engaged to develop proposals for the substantial refurbishment of an existing Water Mill in Bedfordshire.
15/01/09
Building refurbishment works have completed and the client has moved in to their new home.
23/08/08
MDA have been commissioned to prepare design proposals for a new prominent penthouse development in St John’s Wood, London.
23/05/08
Construction work has commenced on site at no. 16 Silver Birch Avenue, Sheffield for the development of a new 5 bedroom house
15/03/08
MDA have been commissioned to develop designs for two villas in the historic quarter of Capdepera, a hill side town on Mallorca, Spain
10/01/08
Full planning permission and conservation area consent has been granted for the development of a new modern family home in Fulwood, on the outskirts of Sheffield.
18/09/07
MDA have been commissioned to develop a series of feasibility studies followed by planning, building control and construction information for student accommodation in existing properties in Cardiff & Exeter. There is a role out programme for 22 properties over the next year.
18/09/07
MDA have been commissioned to develop design amendments to an existing planning permission for a 6 bedroom property, followed by full construction information to achieve building control approval and the construction of the house.
21/06/07
MDA have been commissioned to develop designs for a new private family house on the outskirts of Sheffield.
30/03/07
Practical Completion was achieved at the end of March when the client successfully moved into the refurbished house....more
30/03/07
01/05/06
Worked commenced today on site with the appointment of Parkway Construction for the building work....more